Time scale decomposition in production planning for unreliable flexible manufacturing systems
From MaRDI portal
Publication:1388899
DOI10.1016/0377-2217(94)00268-HzbMath0910.90162OpenAlexW1976171921MaRDI QIDQ1388899
Publication date: 11 June 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00268-h
stochastic controlunreliable flexible manufacturing systemshedging point policiesswitching diffusion modelstwo-time scale structure
Related Items (5)
Turnpikes in flow control models of unreliable manufacturing systems ⋮ Ship-to-order supplies: contract breachability and the impact of a manufacturer-owned direct channel ⋮ Competition under industry-stock-driven prevailing market price: environmental consequences and the effect of uncertainty ⋮ Time-dependent and independent control rules for coordinated production and pricing under demand uncertainty and finite planning horizons ⋮ Two-stage generalized age maintenance of a queue-like production system
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Probability methods for approximations in stochastic control and for elliptic equations
- Numerical computation of singular control problems with application to optimal heating and cooling by solar energy
- Optimal control of Markov chains admitting strong and weak interactions
- Singulary perturbed Markov control problem: Limiting average cost
- Saddle points of Hamiltonian systems in convex Lagrange problems having a nonzero discount rate
- Convergence of stochastic approximation coupled with perturbation analysis in a class of manufacturing flow control models
- Boundedly optimal control of piecewise deterministic systems
- Optimal feedback production planning in a stochastic two-machine flowshop
- Maintenance optimization of a production system with buffer capacity
- Turnpikes in flow control models of unreliable manufacturing systems
- Hierarchical algorithms for discounted and weighted Markov decision processes
- An optimal control problem with a random stopping time
- Impulse control of piecewise deterministic Markov processes
- Turnpike properties for a class of piecewise deterministic systems arising in manufacturing flow control
- Optimal Control of Switching Diffusions with Application to Flexible Manufacturing Systems
- A Unified View of the IPA, SF, and LR Gradient Estimation Techniques
- Flow balance equations for the steady-state distribution of a flexible manufacturing system
- Optimal control of piecewise deterministic markov process
- Optimal control of production rate in a failure prone manufacturing system
- Approximation and bounds in discrete event dynamic programming
- Performance evaluation and perturbation analysis of discrete event dynamic systems
- An Optimal Stochastic Production Planning Problem with Randomly Fluctuating Demand
- Production control of a manufacturing system with multiple machine states
- Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems
- A singular perturbation approach to modeling and control of Markov chains
- A note on "Multilayer control of large markov chains"
- A turnpike improvement algorithm for piecewise deterministic control
- An Asymptotic Analysis of Hierarchical Control of Manufacturing Systems Under Uncertainty
- Decomposition and Nondifferentiable Optimization with the Projective Algorithm
- Overtaking Optimal Regulation and Tracking of Piecewise Diffusion Linear Systems
- Perturbation and stability theory for Markov control problems
- Algorithms for singularly perturbed limiting average Markov control problems
- Hierarchical controls in stochastic manufacturing systems with machines in tandem
- Perturbation Analysis for the Design of Flexible Manufacturing System Flow Controllers
- Dynamic Programming and Minimum Principles for Systems with Jump Markov Disturbances
- Multilayer control of large Markov chains
- Singular Perturbations in Manufacturing
- Manufacturing flow control and preventing maintenance: a stochastic control approach
This page was built for publication: Time scale decomposition in production planning for unreliable flexible manufacturing systems