Time scale decomposition in production planning for unreliable flexible manufacturing systems

From MaRDI portal
Publication:1388899

DOI10.1016/0377-2217(94)00268-HzbMath0910.90162OpenAlexW1976171921MaRDI QIDQ1388899

Alain B. Haurie

Publication date: 11 June 1998

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)00268-h




Related Items (5)



Cites Work


This page was built for publication: Time scale decomposition in production planning for unreliable flexible manufacturing systems

OSZAR »